Birla Gold – Maihar Plant ESP Refurbishment

Scope of Work

Engineering consulting for the optimisation of the Dry ESP operation and emission targets objective at the Maihar Plant. Completed refurbishments are to ensure emission compliance and continuous operation during normal operations.

Equipment Supplied

  • Engineering Services for plant optimisation
  • Auditing of all systems to improve ESP performance
  • Site management of works inclusive of mobilisation and demobilisation
  • Mechanical Repairs
  • Electrical/Control Upgrades
  • Performance testing and commissioning

Details

Location

Madhya Pradesh, India

Project Duration

6 months

Completion Date

2000

Specifications

Gas Flow rate

Not Available

ESP Manufacturer

Baltec Australia

Inlet Dust burden

150 g/Nm3

Emission Levels

50 mg/Nm3   (max)