Project
Anglo Gold Ashanti Sunrise Dam
Scope of Work
Design, manufacture, fully assembled (where practical) of one single new fabric filter baghouse to replace the existing deteriorate assembly currently installed at the existing plant. The overall assembly was to fit within the pre-existing location to minimise site work and modification.
Equipment Supplied
- Engineering design of the new baghouse assembly
- Supply of all ancillary equipment associated with the operation
- Manufacture of all equipment, specially bags and cages
- Ongoing services and spare parts
Details
Location
Laverton, WA
Project Duration
6 months
Completion Date
2018
Specifications
Gas Flow rate
36,000 Nm3/hr
Operating Temp
Ambient
Required Outlet Emissions
50 mg/Nm3
Filter Media
Bags and Cases assembly