Project
Electric Arc Furnace, Nox Removal
Scope of Work
Design, manufacture and install a Selective Catalytic Reduction (SCR) DeNOx System at Australian Fused Materials, East Rockingham WA.
Equipment Supplied
- Gas-to-Gas heat exchanger
- Duct burner and associated gas train
- Selective Catalytic Reduction (SCR) housing
- Lateral Flow Reactor (LFR) module/s
- Catalyst
- Ammonia injection grid and associated control valve train
- Instrumentation
- Access platform
- Mechanical and electrical installation
- Commissioning
Details
Location
East Rockingham, WA
Project Duration
12 months
Completion Date
1999
Specifications
Gas Flow rate
33,600 Nm3/hr
NOX inlet load
up to 1,500 ppm
NOx outlet load
less than 100ppm