Mulwala Propellants Manufacturing Facility

Print this page
Mulwala-2
Mulwala-1
MULWALA

Project

Propellants Manufacturing Facility DeNOx System

Scope of Work

Design, supply and commissioning of a NOx Scrubber Plant for the Mulwala Redevelopment Project.

Equipment Supplied

  • Six (6) Stage Scrubber System
  • Extraction ID Fan
  • Five (5) Recirculation pumps and piping
  • Four (4) Chemical storage tanks
  • Instrumentation and dosing pumps
  • Mechanical installation and Commissioning
  • Operator training

Details

Location

Mulwala, NSW

Project Duration

10 months

Completion Date

2010

Specifications

Ventilation rate

8,500 m3/hr

NOx inlet load

up to 5,780 ppm

Acid Mist inlet load

up to 1,000 ppm

NOx outlet conc.

< 200 mg/m3

NH3 outlet conc.

< 20 ppm