Project
Propellants Manufacturing Facility DeNOx System
Scope of Work
Design, supply and commissioning of a NOx Scrubber Plant for the Mulwala Redevelopment Project.
Equipment Supplied
- Six (6) Stage Scrubber System
- Extraction ID Fan
- Five (5) Recirculation pumps and piping
- Four (4) Chemical storage tanks
- Instrumentation and dosing pumps
- Mechanical installation and Commissioning
- Operator training
Details
Location
Mulwala, NSW
Project Duration
10 months
Completion Date
2010
Specifications
Ventilation rate
8,500 m3/hr
NOx inlet load
up to 5,780 ppm
Acid Mist inlet load
up to 1,000 ppm
NOx outlet conc.
< 200 mg/m3
NH3 outlet conc.
< 20 ppm