Project
Ravensthorpe Nickel Secondary Neutralisation Tank Venting
Scope of Work
Design, manufacture and deliver a tank venting system complete with entrained droplet separation. P&V vents, ducting, entrainment separator, ID fan and stack for installation at the Ravensthorpe site.
Equipment Supplied
- Pressure and vacuum vents (12)
- Interconnecting ductwork
- Entrainment separator (1) casing and
internals - Exhaust stack (1)
- ID fan
- Design of support structure, stairways and
access platforms, piping, valves.
Details
Location
Ravensthorpe, WA
Project Duration
24 months
Completion Date
2007
Specifications
Inlet flow rate
32,000 Am3/hr
Inlet entrained liquid loading
NOT SPECIFIED