Project
Tiwest Joint Venture Waste Gas Scrubbing System
Scope of Work
Design, manufacture, fully assemble and electrically wire up, 3 waste gas scrubbing trains for installation at Tiwest, Kwinana site.
Equipment Supplied
- Scrubbing vessels (3) designed as pressure vessels to BS4994
- Interconnecting Ducting and Dampers
- Recirculation pumps
- Valves and piping
- Superstructure skids to house equipment
- Ladders, stairs and platforms
- Installation of control instrumentation
- Wiring for power and control
Details
Location
Kwinana, WA
Project Duration
6 months
Completion Date
2001
Specifications
Gas Flow rate
14,000m3/hr
SiCl4 inlet load
3900 ppm
SiCl4 outlet load
less than 5 ppm
TiCl4 inlet load
6800ppm
TiCl4 outlet load
less than 5 ppm