Project
Visy Tumut ESP Refurbishment
Scope of Work
For the refurbishments of ESP located at the Tumut Plant.
Equipment Supplied
- Inspection and investigation works
- Site management of works inclusive of mobilisation and demobilisation
- Mechanical Repairs
- Electrical/Control Upgrades
- Performance testing and commissioning
Details
Location
Tumut, NSW
Project Duration
3 months
Completion Date
2018
Specifications
Gas Flow rate
Not Available
ESP Manufacturer
FLSmidth
Inlet Dust burden
Not Available
Emission Levels
100 mg/Nm3 (max)