Project
WA Water Corporation – WA21 The Woodman Alliance Odour Control System.
Scope of Work
Design, manufacture and install Odorgard® scrubbing system at Woodman Point Waste Water Treatment Plant.
Equipment Supplied
- FRP Scrubbers
- Odorgard® reactors
- Recirculation pumps and piping
- Instrumentation
- Dosing pumps
- Access platform
- Commissioning and performance testing
- Operator training
Details
Location
Woodman Point, WA
Project Duration
12 months
Completion Date
2002
Specifications
Ventilation rate
24,000 m3/hr
H2S inlet load
up to 80 ppm
Inlet odour concentration
450,000 OU
H2S outlet concentration
max. 0.05 ppm
Outlet odour concentration
1000 OU