Australian Fused Materials

Print this page
AUSTRALIAN FUSED MATERIALS
AUSTRALIAN FUSED MATERIALS
TAPC

Project

Electric Arc Furnace, Nox Removal

Scope of Work

Design, manufacture and install a Selective Catalytic Reduction (SCR) DeNOx System at Australian Fused Materials, East Rockingham WA.

Equipment Supplied

  • Gas-to-Gas heat exchanger
  • Duct burner and associated gas train
  • Selective Catalytic Reduction (SCR) housing
  • Lateral Flow Reactor (LFR) module/s
  •  Catalyst
  • Ammonia injection grid and associated control valve train
  • Instrumentation
  • Access platform
  • Mechanical and electrical installation
  • Commissioning

Details

Location

East Rockingham, WA

Project Duration

12 months

Completion Date

1999

Specifications

Gas Flow rate

33,600 Nm3/hr

NOX inlet load

up to 1,500 ppm

NOx outlet load

less than 100ppm