



Project
Gas Turbine Power Station Carbon Dioxide Absorber
Scope of Work
Design and supply of a CO2 Absorber for two demineralised water storage tanks at Braemar Power Station.
Equipment Supplied
- Inlet and outlet headers
- Humidification
- Carbon dioxide (8) absorber canisters
- Galvanised support skid
- Operating and maintenance manuals
Details
Location
Braemer, QLD
Project Duration
3 weeks
Completion Date
2009
Specifications
Ventilation rate
300 m3/hr
CO2 inlet load
up to 400 ppm
CO2 outlet concentration
under 4 ppm
