Braemar Power Station

Print this page
braemer-1
braemer-2
Braemar_Power_Station

Project

Gas Turbine Power Station Carbon Dioxide Absorber

Scope of Work

Design and supply of a CO2 Absorber for two demineralised water storage tanks at Braemar Power Station.

Equipment Supplied

  • Inlet and outlet headers
  • Humidification
  • Carbon dioxide (8) absorber canisters
  • Galvanised support skid
  • Operating and maintenance manuals

Details

Location

Braemer, QLD

Project Duration

3 weeks

Completion Date

2009

Specifications

Ventilation rate

300 m3/hr

CO2 inlet load

up to 400 ppm

CO2 outlet concentration

under 4 ppm