Project
Dust Control and Ventilation Lump Re-Screening Plant
Scope of Work (previous Licencee)
Design, manufacture and deliver a Lump Re-Screening Plant Dust Control system comprising 1 Model 1235 Aeromix Scrubber for installation at Cape Lambert site.
Equipment Supplied
- Aeromix venturi (1) vessel
- Induced Draft (1) fan and outlet silencer
- Interconnecting ducting
- Valves and piping
- Structure support equipment
- Ladders and access platforms
- Ductwork and supports
Details
Location
Cape Lambert, WA
Project Duration
10 months
Completion Date
2001
Specifications
Inlet flow rate
167,000m3/hr
Inlet Dust Load
25 g/m3
Outlet dust load
less than 100 mg/m3
Slurry conc.
15% max.
Water demand
390 lpm