Project

Dust Control and Ventilation Lump Re-Screening Plant

Scope of Work (previous Licencee)

Design, manufacture and deliver a Lump Re-Screening Plant Dust Control system comprising 1 Model 1235 Aeromix Scrubber for installation at Cape Lambert site.

Equipment Supplied

  • Aeromix venturi (1) vessel
  • Induced Draft (1) fan and outlet silencer
  • Interconnecting ducting
  • Valves and piping
  • Structure support equipment
  • Ladders and access platforms
  • Ductwork and supports

Details

Location

Cape Lambert, WA

Project Duration

10 months

Completion Date

2001

Specifications

Inlet flow rate

167,000m3/hr

Inlet Dust Load

25 g/m3

Outlet dust load

less than 100 mg/m3

Slurry conc.

15% max.

Water demand

390 lpm