Project
Ammonia Flare System
Scope of Work
Design and supply of a Ammonia Flare System to be installed at the existing facility at Kwinana Beach, WA.
Equipment Supplied
- Continuous Pilot System and tips
- Pilot and ignition control system
- All associated ancillary equipment
- Flare stacks
- Erection supervision
- Commissioning
Details
Location
Kwinana Beach, WA
Project Duration
4 months
Completion Date
2000
Specifications
Flow rate
5,200 kg/hr
Destruction media
Ammonia
Destruction efficiency
95% min