CSBP

Print this page
CSBP
CSBP
csbp-logo

Project

Ammonia Flare System

Scope of Work

Design and supply of a Ammonia Flare System to be installed at the existing facility at Kwinana Beach, WA.

Equipment Supplied

  • Continuous Pilot System and tips
  • Pilot and ignition control system
  • All associated ancillary equipment
  • Flare stacks
  • Erection supervision
  • Commissioning

Details

Location

Kwinana Beach, WA

Project Duration

4 months

Completion Date

2000

Specifications

Flow rate

5,200 kg/hr

Destruction media

Ammonia

Destruction efficiency

95% min