Ravensthorpe Nickel Secondary Neutralisation Tank Venting

​​Scope of Work

Design, manufacture and deliver a tank venting system complete with entrained droplet separation. P&V vents, ducting, entrainment separator, ID fan and stack for installation at the Ravensthorpe site.

Equipment Supplied

  • Pressure and vacuum vents (12)
  • Interconnecting ductwork
  • Entrainment separator (1) casing and
    internals
  • Exhaust stack (1)
  • ID fan
  • Design of support structure, stairways and
    access platforms, piping, valves.

Details

Location

Ravensthorpe, WA

Project Duration

24 months

Completion Date

2007

Specifications

Inlet flow rate

32,000 Am3/hr

Inlet entrained liquid loading

NOT SPECIFIED