Bolivar STP

Print this page
Bolivar Stp -1
Bolivar Stp -2
Bolivar Stp -3

Project

South Australian Water Corporation  Odour Control System

Scope of Work

Design, manufacture, installation, commissioning and testing of an Odorgard® scrubbing system at Bolivar Sewage Treatment Plant.

Equipment Supplied

  • Civil works comprising scrubber, bulk chemical storage bunding
  • FRP dampers and ductin
  • FRP Scrubber
  • Odorgard® reactor
  • Bulk chemical storage facility
  • Chemical dosing pumps
  • Recirculation pumps and piping
  • Access platform
  • Mechanical and electrical installation
  • Operator training
  • Fans
  • Instrumentation
  • Switchgear and control assembly
  • Commissioning and performance testing

Details

Location

Bolivar, South Australia

Project Duration

9 months

Completion Date

2001

Specifications

Ventilation rate

36,000 m3/hr

H2S inlet load

up to 5 ppm

Inlet odour concentration

50,000 OU/sec

Outlet odour concentration

500 OU/sec