SYDNEY WATER CORPORATION

Print this page
bangor-1-1
bangor-1-2
bangor-1-logo

Project

Bangor SPS Odour Control System

Scope of Work

Design, manufacture and install an activated carbon bed filter at Bangor Sewage Pumping Station.

Equipment Supplied

  • Civil works
  • Stainless Steel ducting
  • Prefilter
  • FRP carbon bed vessel
  • Fans and silencers
  • Stainless steel exhaust stack
  • Instrumentation
  • Access platform
  • Switchgear and control assembly
  • Mechanical and electrical installation
  • Commissioning and performance testing

Details

Location

Bangor, NSW

Project Duration

6 months

Completion Date

2001

Specifications

Ventilation rate

1,800 m3/hr

H2S inlet load

up to 5 ppm

H2S outlet concentration

max. 0.05 ppm