Project
Bangor SPS Odour Control System
Scope of Work
Design, manufacture and install an activated carbon bed filter at Bangor Sewage Pumping Station.
Equipment Supplied
- Civil works
- Stainless Steel ducting
- Prefilter
- FRP carbon bed vessel
- Fans and silencers
- Stainless steel exhaust stack
- Instrumentation
- Access platform
- Switchgear and control assembly
- Mechanical and electrical installation
- Commissioning and performance testing
Details
Location
Bangor, NSW
Project Duration
6 months
Completion Date
2001
Specifications
Ventilation rate
1,800 m3/hr
H2S inlet load
up to 5 ppm
H2S outlet concentration
max. 0.05 ppm