Project
Whyalla Ausmelt Eductor Venturi Scrubber
Scope of Work (previous Licencee)
Design and supply of an Eductor Venturi Scrubber (EVS) system at the Whyalla Zinc Smelting Plant.
Equipment Supplied
- Lime handling and slurry preparation
- EVS (1)
- Interconnecting ductwork and stack
- Instrumentation
- Recirculation slurry pumps
- Commissioning
Details
Location
Whyalla, S.A.
Project Duration
5 months
Completion Date
2008
Specifications
Inlet gas flowrate
34,000 Nm3 (dry) /hr
Inlet gas temperature
200ºC
Inlet SO2 concentration
up to 0.66 % v/v
Nominal SO2 removal
90%