Project

Cockburn Cement ESP Refurbishment

​Scope of Work

For the refurbishments of ESP located at the Munster Plant. The refurbishments are to ensure emission compliance and continuous operation during normal operations.

Equipment Supplied

  • Inspection and investigation works
  • Site management of works inclusive of mobilisation and demobilisation
  • Mechanical Repairs
  • Electrical/Control Upgrades
  • Performance testing and commissioning

Details

Location

Munster, WA

Project Duration

3 months

Completion Date

2005

Specifications

Gas Flow rate

144,000 Nm3/hr

ESP Manufacturer

Not Available

Inlet Dust burden

150 g/Nm3

Emission Levels

50 mg/Nm3   (max)