Project
Onesteel Newcastle Electroplating Facility Fume Extraction and Wet Scrubbing System
Scope of Work
Design, detail engineering, procurement, manufacture and supply fume extraction/wet scrubbing system for installation at Onesteel electroplating facility at Newcastle.
Equipment Supplied
- Scrubbing vessels, 3.4m dia, 7.25m high packed tower with 10m stack
- Interconnecting Ducting
- Fume extraction fans
- Recirculation and chemical dosing pumps
- Valves, instrumentation and piping
Details
Location
Newcastle, NSW
Project Duration
6 months
Completion Date
2002
Specifications
Gas flow rate
87,000Am3/hr
HCI/NO2 inlet load
100ppm
HCI/NO2 outlet load
10ppm