Project
OneSteel (Whyalla ESP rebuilds)
Scope of Work
For the refurbishments of three ESP located at the Basic Oxygen Steel making facilities, which are used as part of the clearing of the waste gases. The refurbishments are to ensure emission compliance.
Equipment Supplied
- Aerodynamic Correction Steps
- Mechanical Repairs
- Electrical/Control Upgrades
- Insulator Failure Prevention
- Supply and installation of new monorail assembly
- Performance testing and commissioning
- Site management of works inclusive of mobilisation and demobilisation
Details
Location
Whyalla, SA
Project Duration
3 months
Completion Date
2014
Specifications
Gas Flow rate
175,000 Nm3/hr
ESP Manufacturer
Lurgi Australia Pty Ltd.
Inlet Dust burden
30g/Nm3
Emission Levels
30 mg/Nm3 (max)