Boral Maldon ESP Refurbishment

Scope of Work

For the refurbishments of ESP located at the Maldon Cement Plant. The refurbishments are to ensure emission compliance.

Equipment Supplied

  • Inspection and investigation works
  • Site management of works inclusive of mobilisation and demobilisation
  • Mechanical Repairs
  • Electrical/Control Upgrades
  • Performance testing and commissioning
  • rebon Plant

Details

Location

Maldon, NSW

Project Duration

3 months

Completion Date

2015

Specifications

Gas Flow rate

Not Available

ESP Manufacturer

Joy Manufacturing Pty Ltd

Inlet Dust burden

Not Available

Emission Levels

50 mg/Nm3   (max)

Case Studies

Whyalla

Whyalla Ausmelt

Whyalla

Print this page
Whyalla Ausmelt
Whyalla Ausmelt
TAPC

Project

Whyalla Ausmelt Eductor Venturi Scrubber

Scope of Work (previous Licencee)

Design and supply of an Eductor Venturi Scrubber (EVS) system at the Whyalla Zinc Smelting Plant.

Equipment Supplied

  • Lime handling and slurry preparation
  • EVS (1)
  • Interconnecting ductwork and stack
  • Instrumentation
  • Recirculation slurry pumps
  • Commissioning

Details

Location

Whyalla, S.A.

Project Duration

5 months

Completion Date

2008

Specifications

Inlet gas flowrate

34,000 Nm3 (dry) /hr

Inlet gas temperature

200ºC

Inlet SO2 concentration

up to 0.66 % v/v

Nominal SO2 removal

90%

Case Studies

Cockburn Cement

Cockburn Cement

Cockburn Cement

Print this page
Cockburn Cement
Cockburn Cement
Cockburn Cement

Project

Cockburn Cement ESP Refurbishment

Scope of Work

For the refurbishments of ESP located at the Munster Plant. The refurbishments are to ensure emission compliance and continuous operation during normal operations.

Equipment Supplied

  • Inspection and investigation works
  • Site management of works inclusive of mobilisation and demobilisation
  • Mechanical Repairs
  • Electrical/Control Upgrades
  • Performance testing and commissioning

Details

Location

Munster, WA

Project Duration

3 months

Completion Date

2005

Specifications

Gas Flow rate

144,000 Nm3/hr

ESP Manufacturer

Not Available

Inlet Dust burden

150 g/Nm3

Emission Levels

50 mg/Nm3   (max)

Case Studies

Barwon Water

Barwon Water

Barwon Water

Print this page
Barwon Water
Barwon Water
TAPC

Project

Northern Water Plant Project  Forced Draft Co2 De-Gasser System

Scope of Work

Design, manufacture and deliver a CO2 De-Gasser system comprising a specifically designed FRP Forced Draft De-Gasser unit.

Equipment Supplied

  • Vessel c/w dual spray headers
  • Axial (2) fans with inlet silencers
  • Inlet plenums with filter housings
  • Pressure Instrumentation
  • Interconnecting ducting with supports
  • Sump Vessel

Details

Location

North Geelong (Corio), VIC

Project Duration

4 months

Completion Date

2012

Specifications

Inlet flow rate

67.2 L/s

CO2 removal efficiency

≥90%

Sump Capacity

40m3

Case Studies

Eastern Creek

Eastern Creek

Eastern Creek

Print this page
Eastern Creek
Eastern Creek
TAPC

Project

UR 3R Treatment Facility Ammonia Scrubber

Scope of Work

Design, supply and commissioning of a foam washer and ammonia scrubbing system for a denitrification reactor at the Eastern Creek UR 3R facility.

Equipment Supplied

  • Foam (1) knock-out vessel
  • Ammonia (1) scrubber
  • Recirculation pumps and piping
  • ID Fans and ductwork
  • Instrumentation

Details

Location

Eastern Creek, NSW

Project Duration

10 months

Completion Date

2004

Specifications

Gas inlet flow-rate

9,250 Am3/hr

Gas inlet temp. (max)

55 ºC

NH3 inlet load

9,500 ppm

NH3 outlet concentration

32 ppm