Goro Cobalt

Print this page
goro-cobalt-2
goro-cobalt-1
GORO CHLORIDE

Project

Goro Nickel Refinery Cobalt Vent Entrained Droplet Separator

​​Scope of Work

Design and deliver a 1 stage entrained droplet eliminator system for the Nickel Refinery for installation at the Goro site.

Equipment Supplied

  • FRP entrainment separator vessel
  • Polypropylene mesh pad
  • FRP lined steel ID Fan (1)
  • FRP stack (1)
  • Piping, valves and instruments

Details

Location

Goro, New Caledonia

Project Duration

12 months

Completion Date

2008

Specifications

Inlet flow rate

6,410 Am3/hr

Inlet HCl loading

60 mg/Nm3

Outlet HCl droplet emission

<10 mg/Nm3