Australian Paper

Print this page
Australian Paper
Australian Paper
australian-paper-logo

Project

Australian Paper ESP Refurbishmen

​Scope of Work

For the refurbishments of ESP located at the Maryvale Plant. The refurbishments are to ensure emission compliance and continuous operation during normal operations.

Equipment Supplied

  • Inspection and investigation works
  • Site management of works inclusive of mobilisation and demobilisation
  • Mechanical Repairs
  • Electrical/Control Upgrades
  • Performance testing and commissioning

Details

Location

Maryvale, VIC

Project Duration

3 months

Completion Date

2014

Specifications

Gas Flow rate

Not Available

ESP Manufacturer

FLSmidth / Flakt / Joy

Inlet Dust burden

Not Available

Emission Levels

50 mg/Nm3   (max)