Birla Gold – Maihar Plant ESP Refurbishment
Scope of Work
Engineering consulting for the optimisation of the Dry ESP operation and emission targets objective at the Maihar Plant. Completed refurbishments are to ensure emission compliance and continuous operation during normal operations.
Equipment Supplied
- Engineering Services for plant optimisation
- Auditing of all systems to improve ESP performance
- Site management of works inclusive of mobilisation and demobilisation
- Mechanical Repairs
- Electrical/Control Upgrades
- Performance testing and commissioning
Details
Location
Madhya Pradesh, India
Project Duration
6 months
Completion Date
2000
Specifications
Gas Flow rate
Not Available
ESP Manufacturer
Baltec Australia
Inlet Dust burden
150 g/Nm3
Emission Levels
50 mg/Nm3 (max)