



Project
Goro Nickel Refinery Cobalt Vent Entrained Droplet Separator
Scope of Work
Design and deliver a 1 stage entrained droplet eliminator system for the Nickel Refinery for installation at the Goro site.
Equipment Supplied
- FRP entrainment separator vessel
- Polypropylene mesh pad
- FRP lined steel ID Fan (1)
- FRP stack (1)
- Piping, valves and instruments
Details
Location
Goro, New Caledonia
Project Duration
12 months
Completion Date
2008
Specifications
Inlet flow rate
6,410 Am3/hr
Inlet HCl loading
60 mg/Nm3
Outlet HCl droplet emission
<10 mg/Nm3
