Project
South Australian Water Corporation Odour Control System
Scope of Work
Design, manufacture, installation, commissioning and testing of an Odorgard® scrubbing system at Bolivar Sewage Treatment Plant.
Equipment Supplied
- Civil works comprising scrubber, bulk chemical storage bunding
- FRP dampers and ductin
- FRP Scrubber
- Odorgard® reactor
- Bulk chemical storage facility
- Chemical dosing pumps
- Recirculation pumps and piping
- Access platform
- Mechanical and electrical installation
- Operator training
- Fans
- Instrumentation
- Switchgear and control assembly
- Commissioning and performance testing
Details
Location
Bolivar, South Australia
Project Duration
9 months
Completion Date
2001
Specifications
Ventilation rate
36,000 m3/hr
H2S inlet load
up to 5 ppm
Inlet odour concentration
50,000 OU/sec
Outlet odour concentration
500 OU/sec