Project
Aeromix Dust Control system for Lycopodium Akyem and Ahafo projects
Scope of Work
Design Manufacture and deliver of dust control system comprising of 1 off Aeromix 485 and 1 off Aeromix 385.
Equipment Supplied
- TAPC 485 Aeromix
- 2 off ID Fans
- Inter connecting ducting
- Ductwork support
Details
Location
Akyem Africa
Project Duration
3 months
Completion Date
2013
Specifications
Volume rate
25,734 m3/hr
Dust Load
30 g/m3
Make-up Water Rate
1.225 l/sec
Removal Efficiency
99% particulate greater than 2 micron